How to install.
Lp shake siding installation instructions.
Starting from left to right level and install shake so bottom edge is no more than 1 2 inch 13 mm below.
Lp smartside trim siding products are treated with our proprietary smartguard process.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Application instructions cont install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Find product specifications warranties installation instructions and msds for all lp building solutions in our product literature resource center.
We offfer rigidstack siding rigidmount blocks trim and weatherproofing packages.
Lp smartside 3 8 x 12 x 48 reversible cedar texture strand shake offers the beautiful look of real cedar shake siding with the greater durability of treated engineered wood and less maintenance required.
All siding joints must fall on studs.
Diamond kote building products is a preferred prefinisher for lp smartside an engineered siding wood product.
Lp smartside cedar shake is a reversible siding product that can be applied with either a staggered edge appearance or rotated 180 degrees to achieve straight edge appearance.
To face of siding but not be overdriven to distort the siding surface.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
How to install lp smartside trim siding.
Diagrams 4a 4b staggered edge.
Our proprietary smartguard manufacturing process helps protect against termite damage and fungal decay with a 50 year product warranty.
Download our helpful installation instructions and watch our informative how to videos.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.